The bike rack installation last Saturday went very well. We learned how to mix concrete (like Bisquick one should lean toward dry rather than wet), how to dig conservative postholes, how to deal with big rocks, and how to pour concrete. The rain squall didn’t slow the crew down at all.
Thanks to all who helped–Cole, Drew, and Harry from the Scouts and Joe, Mike, Andy, and Hank from the adults. The adults didn’t have to do much–the Scouts did most of the real work.
We have had very nice thank you notes from the organizers and from the principal of the school.
-Hank